TB 0295 Distribution Substation Low Voltage Circuit Breaker Settings Application, Validation & Commissioning May 05, 2020 The purpose of this bulletin is to reduce errors associated with the commissioning of low voltage circuit breakers (LVCB) located within distribution substations. This shall be achieved by ensuring protection settings are correctly applied through revised commissioning and validation processes.
TB 0293 Distribution Joint and Termination Kits May 01, 2020 This Technical Bulletin has been released to update all staff and ASP’s to changes to the approved materials list of LV and HV joint and termination kits.
TB 0294 22kV Distribution Supply Strategy for the Western Sydney Aerotropolis Area Apr 29, 2020 This bulletin is to inform Accredited Service Providers (ASP’s) of the strategy to establish a 22kV distribution network in the Western Sydney Aerotropolis Area.
TB 0281A Screened Terminations in Safelink Switchgear Apr 24, 2020 To introduce ABB straight screened connectors (terminations) for ABB Safelink switchgear.
TB 0291 Stay wires through LV Circuits Apr 06, 2020 This Technical Bulletin is to clarify the requirements for stays that pass through LV circuits.
TB 0284 Temporary Cessation of installation of new spans of NMSHVABC Mar 20, 2020 This technical bulletin is to inform all stakeholders about the Endeavour Energy’s decision to cease the installation of any new spans with NMHSHVABC.
TB 0290 Changes to the Pre-Summer Program Requirements Feb 24, 2020 This Technical Bulletin sets out changes to the due dates for the completion of the Pre-Summer Bushfire Inspection (PSBI) and rectification of Bushfire defects.
TB 0286 Continuous current ratings for transmission underground cables Nov 21, 2019 This technical bulletin is to update Endeavour Energy’s transmission underground cables continuous current rating standard, MDI 0046.
TB 0288 Changes to 11/22kV Underground Cables Specification Nov 21, 2019 This technical bulletin is to update the content of the 11/22kV cable specification.
TB 0285 LV 4C 240mm2 Underground Cable Insulation Thickness Nov 07, 2019 This technical bulletin is to change the requirements for the insulation thickness of the LV 4C 240mm² underground cable (Stock code SZ15308).